Categories

Best sellers

All best sellers

Wishlist

No products

Specials

Information

Manufacturers

Newsletter

Insulation Boards Under Tile

Insulation Boards Under Tile

Insulation Boards Under Tile

Using Insulation Boards with floor heating significantly reduces heat-up times and running costs. The insulation improves the response time and heat retention within the room, reducing energy consumption and carbon emissions. 

Availability: IN-STOCK

$231.00

Add to cart

Add to my wishlist

By buying this product you can collect up to 23 loyalty points. Your cart will total 23 points that can be converted into a voucher of $4.60.

30 other products in the same category:

More info

Product types

Code   Description
WIB-4x2-1/4   Insulated backer boards. Dimensions 2'x4''1/4". USA box of 6 boards 48 sq. ft.
WIB-S5/8   5/8" screws for WIB Installation. Sold in box of 100/ct.
WIB-W1/4   Washers w/o tabs for 1/4" WIB Installation. Sold in box of 100/ct.
WIB-SEALANT   Sealant for WIB seams and screws/washers. Required in wet areas only. One tube covers 6 boards.


Over Plywood: Please select screws (WIB-S5/8) and washers (WIB-W1/4). Sold in boxes of 100. In bathrooms, use 1 sealant tube per 6 boards (WIB-SEALANT).

Technical Specifications

Size  2’x4’x¼” (600mm x 1250mm x 6mm)
Weight  4.3 lbs (1.95 kg)
Thermal resistance R-Value  1.08 (m2K/W, SI units)
Compressive strength  36 psi (0.40 N/mm²)
Water Absorption (Capillary)  Nil
Flammability  flame spread < 20
Thermal conductivity  0.23 BTU in/hr.F
Approvals  cULus

 

ADVANTAGES

• WIBs will save you money when used in conjunction with our underfloor heating by acting as a very efficient thermal barrier.

• They reflect the heat upwards into the floor tile instead of allowing heat to warm up the concrete slab below.

• Heat up Times with Floor Insulation In testing, heat-up time was cut from over 2½ hours to just 25 minutes. This data applies to Warmup heating products only.                                            

• Installing WIBs drastically improves floor heating efficiency, with a quick heating time, with a 78% faster heating time than over concrete slab alone.  Heat up times over a 59F degree concrete slab were 78% faster than when applied directly over the subfloor. While a Warmup mat over WIBs reaches 80 degrees in 64 minutes, a traditional system took 5 full hours to reach 77F.

• This also means that the system ran a lot less, and proved to provide 71% savings in electrical usage.

  • Depending on the cost of electricity and price of the insulation boards, pay-back time was estimated between 1.7 and 2.1 years.